dbba662c

9.2.19. Removal and installation of entrance and intermediate shaft

Details of installation of entrance and intermediate shaft of the transfer case

1 — the Intermediate shaft
2 — the Entrance (leader) shaft

3 — a switching Fork
4 — a switching Rod

 PERFORMANCE ORDER

  1. Remove assembly of interaxal differential (see the Section Removal and installation of interaxal differential).
  2. Take from the transfer case entrance (leader) (2) and intermediate (1) shaft.
  3. Installation is made upside-down, - do not forget to modify axial side plays of shaft by selection of adjusting washers.