dbba662c

6.2.6. Removal and installation of components of an inlet air path

Air cleaner and air filter

Removal of a cover of the power unit with the built-in air cleaner

Details of installation of the filtering air cleaner element


 PERFORMANCE ORDER

  1. Having pulled up, uncover the power unit with the built-in air cleaner (1).
  2. Take the filtering element from under a cover and establish instead of it replaceable.
  3. Establish into place a cover (1).

Assembly of an air inlet with the sensor of measurement of mass of air (MAF)

Details of installation of assembly of an air inlet with the MAF sensor

1 — the Cover of the power unit with the built-in air cleaner
2 — the MAF sensor electrical wiring Socket
3 — the Line of ventilation of a case

4 — the Air inlet
B2/5 — the MAF Sensor

 PERFORMANCE ORDER

  1. Uncover the power unit with the built-in air cleaner (1).
  2. Disconnect an electrical wiring (2) from the MAF (B2/5) sensor.
  3. Disconnect the line of ventilation of a case (3).
  4. Release the line of ventilation of a case to the right of the MAF (B2/5) sensor.
  5. By means of the screw-driver release a clamp of fastening of the MAF (B2/5) sensor.
  6. Wring out a clamp on the electronic activator of a butterfly valve down and remove an air inlet (4) assembled with the MAF (B2/5) sensor.
  7. Disconnect assembly of the sensor (B2/5) from an air inlet (4).
  8. Installation is made upside-down.

Inlet pipeline

Details of installation of the inlet pipeline

6 — the Combined valve
19 — the Inlet pipeline
19/1 — Bolts
19/3 — Sealing laying

89 — the EGR Valve
89/2 — the EGR Line
Arrow — the Opening under the combined valve

Scheme of connection of the inlet pipeline

1 — Secondary vacuum
2 — the Vacuum block of the operating gate
3 — the Air injector of the combined valve
4 — the Inlet pipeline
5 — the Control valve
6 — the Operating valve switch gate

B2/5 — the MAF Sensor
M16/1 — the Electronic activator of a butterfly valve
M33 — the Electric air pump
Y27 — the EGR Valve switch
Y32 — the Valve switch of the air pump

 PERFORMANCE ORDER

  1. Remove assembly of an air inlet with the MAF sensor (see above).
  2. Remove the toplivoraspredelitelny highway with injectors (see the Section Removal and installation of the fuel distributive highway and injectors).
  3. Disconnect the corresponding electrical wiring.
  4. Give a cap nut of fastening of the ventilating line (89/2) to the EGR (89) valve, - for prevention of a provorachivaniye of the union hold it the second key.
  5. Turn out fixing bolts (19/1) and remove the combined valve (6).
  6. Remove assembly of the inlet pipeline (19), - at once to a zakuporta inlet ports of the engine неворсящейся rags.
  7. Remove sealing laying (19/3), - laying is subject to replacement without fail.
  8. Installation is made upside-down. New laying at first is fixed by hairpins (track correctness of an arrangement of laying), which then are turned out just before installation of the pipeline.

Electronic activator of the drive of a butterfly valve

Details of installation of the electronic activator of the drive of a butterfly valve

1/2 — the Line of ventilation of a case
8/1 — Bolts
8/2 — the Sealing ring

19 — the Inlet pipeline
M16/6 — the Electronic activator of a butterfly valve
Arrow — the Socket

 PERFORMANCE ORDER

  1. Uncover the power unit with the air cleaner which is built in in it (see above).
  2. Remove assembly of an air inlet with the MAF sensor (see above).
  3. Disconnect from the inlet pipeline (19) the line of ventilation of a case (1/2).
  4. Disconnect an electrical wiring (shooter).
  5. Turn out fixing bolts (8/1) and remove the activator of a butterfly valve (M16/1), - prepare a replaceable sealing ring (8/2).
  6. Installation is made upside-down.

The Rezonatorny camera with a catchment basin

Details of installation of the rezonatorny camera of an inlet air path and catchment basin (all models) (1 of 2)

1 — Bolts
2 — the Fixing collar
3 — the Drainage hose

9 — Rezonatornaya the camera with a catchment basin

Details of installation of the rezonatorny camera of an inlet air path and catchment basin (all models) (2 of 2)

4 — Screws
5 — Loker
6 — the Termozashchitny screen
7 — the Nut

8 — the Fixing collar
10 Bolt
11 — Sealing laying

 PERFORMANCE ORDER

  1. Open a cowl.
  2. Turn out three fixing bolts (1).
  3. Release a fixing collar (2) and remove a drainage hose (3), - for the purpose of ensuring access remove a loker (5) of protection of a wheel arch (see the Head Kuzov).
  4. Give a nut (7) and remove a collar (8).
  5. Remove assembly of the rezonatorny camera with a catchment basin (9), - track that the drainage hose was turned up.
  6. Check a condition of sealing laying (11), in case of need make its replacement.
  7. Installation is made upside-down. Before a vvorachivaniye the bolt (10) should be greased slightly, - track correctness of landing of a bolt in a guide.