dbba662c

5.2.17. Removal and installation of the broad valve

All sealing elements are subject to replacement without fail!

Details of installation of the broad valve
9 — Bolts
10 — the Broad valve
11 — Sealing laying

 PERFORMANCE ORDER

  1. Remove an evaporator casing (see the Section Removal and installation of the evaporator of the K/V system and its casing).
  2. Remove sealing laying (11), - in case of need prepare a replaceable sealing element.
  3. Turn out fixing bolts (9) and remove the broad valve (10).
  4. Installation is made upside-down.
  5. In conclusion make sure of serviceability of functioning of the К/В system.