dbba662c

5.2.13. Removal and installation of an electric motor of the drive of the mixing gate

Details of installation of an electric motor (M2/6) of the drive of the left mixing gate

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Uncover under the dashboard at the left (see the Head Kuzov).
  3. Turn out fixing screws (1), disunite the socket (3) electrical wirings and remove assembly of an electric motor (M2/6).
  4. Installation is made upside-down.
  5. In conclusion it is necessary to make normalization of an electric motor (M2/6) with use of the reader STAR DIAGNOSIS, - ask for the help on HUNDRED Mercedes-Benzs.
  6. Do not forget to make also cleaning of the processor memory of system of onboard self-diagnostics (see the Head Sistemy of electric equipment of the engine).
  7. Make sure of serviceability of functioning of the К/В system.