dbba662c

5.2.12. Removal and installation of a step electric motor of the drive of the gate of switching of the modes of air circulation

Details of installation of a step electric motor (M2/5) of the drive of the gate of switching of the modes of air circulation

 PERFORMANCE ORDER

  1. On models of the corresponding complete set (ET2 code) activate the service mode of system of an emergency call of TELE AID (see the Section Activation/deactivation of the Service Mode of System of an Emergency Call of TELE AID).
  2. Disconnect a negative wire from the battery.
  3. Remove a ware box (see the Head Kuzov).
  4. Turn out three fixing screws (1) (heads like TORX), disunite the socket (3) electrical wirings and remove an electric motor (M2/5) of the drive of the gate of switching of the modes of circulation from an evaporator casing.
  5. Installation is made upside-down. On models of the corresponding complete set do not forget to deactivate the service mode of the TELE AID system (see the Section Activation/deactivation of the Service Mode of System of an Emergency Call of TELE AID).
  6. In conclusion it is necessary to make normalization of an electric motor (M2/6) of the left mixing gate with use of the reader STAR DIAGNOSIS, - ask for the help on HUNDRED Mercedes-Benzs.
  7. Do not forget to make also cleaning of the processor memory of system of onboard self-diagnostics (see the Head Sistemy of electric equipment of the engine).
  8. Make sure of serviceability of functioning of the К/В system.