dbba662c

5.2.11. Removal and installation of an electric motor of the drive of the ventilating gate

Details of installation of a step electric motor (M2/4) of the drive of the ventilating gate

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery, then remove the dashboard (see the Head Kuzov).
  2. Remove a basic arm of fastening of a casing of the evaporator to the floor panel (see the Section Removal and installation of the evaporator of the K/V system and its casing).
  3. Turn out three fixing screws (1) (heads like TORX), disunite the socket (3) electrical wirings and remove an electric motor (M2/4) of the drive of the air gate from a heater/evaporator casing (around a partition).
  4. Installation is made upside-down.
  5. In conclusion it is necessary to make normalization of an electric motor (M2/4) with use of the reader STAR DIAGNOSIS, - ask for the help on HUNDRED Mercedes-Benzs.
  6. Do not forget to make also cleaning of the processor memory of system of onboard self-diagnostics (see the Head Sistemy of electric equipment of the engine).
  7. Make sure of serviceability of functioning of the К/В system.