dbba662c

12.2.30. Removal and installation of a frame of the top hatch

Details of installation of a frame of the top hatch (1 of 3)

1 — the Frame

3 — the Directing tube

Details of installation of a frame of the top hatch (2 of 3)

2 — the Drainage hose

4 — Bolts

Details of installation of a frame of the top hatch (3 of 3)

6 — Conductors

Removal

 PERFORMANCE ORDER

  1. Uncover the hatch (see the Section Removal and installation of a cover of the top hatch).
  2. Remove a driving cable (see the Section Removal and installation of a cable of the drive of the top hatch).
  3. Remove a ceiling upholstery (see the Part the Equipment of salon).
  4. Otboltite the directing tube (3) from a frame (1) of the hatch.
  5. Disconnect the drainage hoses (2) established in each of frame corners.
  6. Turn out fixing bolts (4) and remove a frame (1).

Installation

 PERFORMANCE ORDER

  1. Establish in side guides and in flutes of a folding bracket (arrow) conductors (6) at the left and on the right.

Conductors it is necessary to uncover only after installations of the hatch.

  1. Fill a frame (1) on the regular place, having taken care of reliability of sealing of a landing gap.
  2. Screw and tighten fixing bolts (4), then take care of correctness of connection of drainage hoses (2) and the directing tube (3).
  3. Further installation is made as it should be, the return to an order of dismantle of components, - do not forget to uncover after installation conductors (6).