dbba662c

11.4.12. Removal and installation of the line of cooling of GUR liquid

Model 463.246/249/250/333

Details of installation of the line of cooling of GUR liquid on models 463.246/249/250/333 (1 of 2)

1 — the Returnable hose

3 — the Returnable hose of the steering mechanism

Details of installation of the line of cooling of GUR liquid on models 463.246/249/250/333 (2 of 2)

2 — the Line of a cooling path

4 — the Nut

 PERFORMANCE ORDER

  1. Lower a forward lattice forward (see the Head Kuzov).
  2. Remove the left block headlight (see the Head Onboard electric equipment).
  3. Remove a loker of protection of the left wheel arch.
  4. Pump out liquid from the GUR tank.
  5. Disconnect a returnable hose (1) from the line (2) of a cooling path, - prepare for collecting the spilled liquid.
  6. Disconnect from the line (2) a returnable hose (3) helmsmen of the mechanism, - prepare for collecting the spilled liquid.
  7. Several times turn a steering wheel from an emphasis against the stop, - ask the assistant to collect the liquid which is forced out from a hose (3).

In order to avoid an exit of the steering pump out of operation do not leave the engine working at all!

  1. Release nuts (4), remove the line of a cooling path (2) and merge from it liquid in the prepared capacity.
  2. Installation is made upside-down, do not forget to fill in fresh liquid in the GUR tank.

Model 463.323

Details of installation of the line of cooling of GUR on models 463.323 (1 of 2)

1 — the Left horn of a horn
2 — the Returnable tube
3 — the Line of a cooling path

4 — the Bolt

Details of installation of the line of cooling of GUR on models 463.323 (2 of 2)

3 — the Line of a cooling path

4 — the Bolt

 PERFORMANCE ORDER

  1. Remove a forward lattice (see the Head Kuzov).
  2. Remove the left block headlight (see the Head Onboard electric equipment).
  3. Pump out liquid from the GUR tank.
  4. Disconnect the left horn of a horn (1).
  5. Disconnect returnable lines (2) from the line of cooling of GUR (3).
  6. Having asked the assistant to collect the liquid which is forced out from a hose, several times turn a steering wheel from an emphasis against the stop.
  7. Release bolts (4), remove the line of a cooling path (3) and merge from it liquid in the prepared capacity.
  8. Installation is made upside-down, do not forget to fill in fresh liquid in the GUR tank.