dbba662c

10.7. Removal and installation of modules of management of ABS/EBV/ESP

Module of management ABS/EBV

For petrol models of release for 30.11.00.

Details of installation of the module of management of ABS/EBV on petrol models of release till 30.11.00

1 — the Nut
2 — Rubber traffic jams
3 — the Holder

K40 — the relay Module
N15/3 — the Module of management of ETC
N47-7 — the Module of management ABS/EBV

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Having released a socket clamp, disconnect an electrical wiring from the module of management of ETC (N15/3).
  3. Having pulled up, remove and, without disconnecting an electrical wiring, take aside the module of the relay (K40).
  4. Release a clamp of the socket and disconnect an electrical wiring from the module of management ABS/EBV (N47-7).
  5. Release a nut (1) on an assembly plate.
  6. Having pulled up, remove the holder (3).
  7. Remove the module of management ABS/EBV (N47-7).
  8. Installation is made upside-down, - track correctness of landing of the holder of rather rubber traffic jams (2), make sure that the electrical wiring was not jammed.
  9. In conclusion make cleaning of the processor memory of system of onboard self-diagnostics (see the Head Sistemy of electric equipment of the engine).

Module of management of ABS

For release models 453.250/333 for 30.09.01.

Details of installation of the module of management of ABS on release models 463.250/333 till 30.09.01

1, 7 — Nuts
2 — the Panel in a passenger foot well
3 — the Assembly plate
4 — an air supply Sleeve in the right back foot well

5, 6 — Sockets
N47-7 — the Module of management ABS/EBV

 PERFORMANCE ORDER

  1. On models of the corresponding complete set (ET2 code) activate the service mode of system of an emergency call of TELE AID (see the Section Activation/deactivation of the Service Mode of System of an Emergency Call of TELE AID).
  1. Turn on the auxiliary accumulator and connect it to the regular battery, then disconnect from the last a negative wire.

    7 — the Auxiliary accumulator
    8 — the Plug of a positive wire of the module
    9 — the Plug of a negative wire of the module
    W10 — Grounding of the battery
  1. Remove the floor carpet panel in the right forward foot well.
  2. Give nuts (1), - in case of need lift the panel (2).
  3. Slightly raise an air duct (4) and by means of an assembly plate (3) remove the module of management of ABS (N47-7).
  4. Having released clamps, disunite sockets (5).
  5. Remove the socket (6).
  6. Give nuts (7) and remove the module of management (N47-7) from an assembly plate (3).
  7. Installation is made upside-down, - at the corresponding complete set (ET2 code) deactivate the service mode of the TELE AID system (see the Section Activation/deactivation of the Service Mode of System of an Emergency Call of TELE AID).
  8. In conclusion make reading of the DTC codes and cleaning of memory of system of onboard self-diagnostics by means of the STAR DIAGNOSIS scanner (6511 1801 00) (see the Head Sistemy of electric equipment of the engine).

Module of management ESP/ABS/BAS

For models 463.246/249/323 and 463.250/333 since 30.09.01 of the issue.

Details of installation of the module of management of ESP on models 463.246/249/323 and 463.250/333 since 30.09.01 of the issue.

1, 7 — Nuts
2 — the Panel in a passenger foot well
3 — the Assembly plate
4 — an air supply Sleeve in the right back foot well

5, 6 — Sockets
N47-5 — the Module of management ESP/BAS

The order of implementation of the procedure is similar described in the previous subsection for the ABS (N47-7) module. Modules of management of ABS and BAS in this case are integrated into the ESP module.